Bitumen is a cherished cornerstone in the construction arena, often recognized as asphalt. Its dense, black, and highly viscous character emerges from its petroleum origins. This extraordinary waterproofing material is celebrated for its unmatched performance, rendering it a vital component throughout the construction industry. Bituminous membranes serve as the quintessential choice for all-encompassing waterproofing solutions, applicable to roofs, basements, and subterranean structures, extending their utility to bridges and numerous constructions. There exist two predominant, distinguished application techniques for these bitumen membranes.
The first is the esteemed Torch-on method, famed for its efficiency, while the second is the Self-adhesive technique, known for its convenience.
In any weather scenario, Torch-on bituminous membranes emerge as the preferred solution, offering unrivaled versatility and ease. When CHENHUA membranes are meticulously applied, they morph into a seamless, watertight barrier that intimately bonds to the surface, ensuring unmatched protection.
Top cover |
Polyethylene Film or other films |
Sand or other granular |
Popular thickness |
3mm 4mm 5mm |
3mm 4mm 5mm |
Reinforcement |
PY or Fiberglass |
PY or Fiberglass |
Size/roll |
1mx10m ,1mx8m ,1mx7.5m |
1mx10m, 1mx8m, 1mx7.5m |

Torch Down Bitumen Waterproof Membranes stand as the superior choice for waterproofing and seepage-proofing across a multitude of building categories. These membranes excel in safeguarding both exposed and concealed areas, from flat roofs to sloped roofs, underground spaces, tunnels, bridges, parking lots, reservoirs, and beyond.
Application method:
1. Substrate:
Ensure that the substrate is impeccably clean, dry, and devoid of contaminants, setting the stage for a flawless application.
Thoroughly remove all dust, along with any loose and friable materials to prepare the surface.
Identify and fully expose blowholes and voids, following up with expert repairs.
2. Primer:
Before membrane placement, apply primer with meticulous care. Clean the substrate using a dust catcher or blower, then coat it with a treatment primer to embellish waterproofing, ensuring effectual dust consolidation and superior adhesion.
3. Membrane placement:
*Unroll the torch-on membrane with precision, ensuring perfect alignment before commencing the torching or bonding procedure.
*Lay each membrane parallel, staggering by at least 1 meter to prevent overlapping joints, thereby enhancing stability.
*Alternate the end-to-end overlaps scrupulously, avoiding alignment along a single line to fortify structural integrity.
*Start at the lowest slope height, prioritizing attention to drains, downpipes, or other critical details for optimal application.
*During the torching phase, apply simultaneous heat to both the membrane and substrate, concentrating on the roll and overlap areas to ensure a secure bond.
*Precisely weld the overlaps to secure a clean trickle of melted mixture, approximately 1 cm wide, along the overlap line for a pristine finish.
4.Apply a roller to firmly compress the membrane surface, guaranteeing impeccable adhesion that withstands the test of time.
Attention:
1. The substrate must remain dry and spotlessly clean. Avoid work on rainy or snowy days to achieve the best results.
2. Refrain from working in winds exceeding grade 5 to ensure safety and maintain quality.
3. Construction should be halted if the temperature drops below 5°C.
4. If rain or snow occurs during construction, it is imperative to employ protective measures for the laid membrane to uphold quality.
5. All personnel must don designated safety uniforms, and fire control equipment is a mandatory requirement during installation.

Packing and shipping:
1. Store membranes in a dry, well-ventilated environment to maintain their pristine quality.
2. Store different types of membranes separately to prevent any mixing.
3. Under optimal storage conditions, the shelf life extends up to one year from the date of production.
4. To ensure the integrity and quality of the membrane rolls during transportation, they must be stored in an upright position. Shield them from direct sunlight and rain to maintain their pristine condition and maximize longevity.
With pallet |
Seaworthy plywood pallet packing, 20pallets/20ft container |
Without pallet |
Plastic bag per roll, common or OEM with customer brand |

1) What's the popular size for Torch-on bitumen membrane?
-The most sought-after dimension is 3mm x 1m x 10m, featuring either a PE or sand granular top. This size epitomizes versatility and outstanding performance, making it the top choice for various applications.
-Dimensions: 4mm thickness x 1m width x 10m length, available with either a PE film or a sand granular top finish, catering to varied aesthetic and functional requirements.
2) What's the essential distinction between SBS and APP?
-SBS and APP are revolutionary modifiers that elevate membrane performance to new heights. SBS modifiers specialize in enhancing cold resistance, making them the quintessential choice for frigid climates. In contrast, APP modifiers excel in boosting heat resistance, perfect for warmer environments. While they share a similar appearance, each modifier delivers targeted performance improvements to tackle unique environmental demands.
3) Is OEM available?
-Certainly! We are thrilled to extend our comprehensive OEM services, warmly inviting you to partner with us and bring your vision to life.
Simply provide us with your logo, and we'll craft an exclusive design tailored to your specifications. Alternatively, you can submit your finalized design, which we will print on PE film. Rest assured, your product will be elegantly packaged and promptly delivered to your desired location.
4) Are you a factory?
-Absolutely, Shandong Chenhua Waterproof Co., Ltd. stands as a reputable and highly experienced professional factory. Since 1994, we have been dedicated to producing a vast array of waterproof materials. Nestled in the renowned China Waterproof Town-Taitou, our comprehensive product range is crafted to fulfill a wide spectrum of waterproofing needs, covering both concealed and visible substrates.
5) What is the delivery time?
-On average, an order is meticulously crafted and completed within 10 days of confirmation. However, please note that delivery timelines may vary depending on specific requirements and order volumes, ensuring a tailored experience for every client.